Our Team has conducted a series of emission tests on a Euro 6c Double Decker Bus.
Installation of our PEMS analysers and the vehicle pre-test inspection was carried out at our Facility in Milton Keynes.
The test, which considered several different speed/load conditions was performed on the Millbrook Proving Ground.
All our projects are supervised by our MD and Lead-Engineer Kevin Tully